| No. |
PROJECT |
YEAR |
CLIENT |
| 1. |
Refurbishment of infrastructure on berths in Port Rashid, Dubai. Work included redressing of revetment behind a sheet pile wall and placing of rocks |
2001 |
Al Futaim
Tarmac |
 |
| 2 |
Construction of small fish processing unit on Masirah Island |
2001 |
Sarwath
Fisheries |
|
| 3 |
Qasr-Al-Alam quay wall construction. Work included seabed preparation, placing of pre-cast concrete blocks and armour rock for scour protection |
2002 |
Tarmac Alawi |
 |
| 4 |
Installation of fender and bollard system at Mina Mussafah |
2002 |
Arab Contractors |
 |
| 5 |
Construction of pre cast block quay wall at Saham Fishery Harbour |
2002 |
CCC |
 |
| 6 |
Construction of kennel facility at Masirah Island |
2002 |
|
|
| 7 |
Fabrication and supply of eleven refrigeration units for Masirah |
|
|
|
| 8 |
Diving services for harbour construction at Al Ashkarah |
2002
-
2003 |
Tarmac Alawi |
 |
| 9 |
Maintenance and overhaul of 40 accommodation suites contracted by US Navy in Masirah Island |
2002
-
2003 |
RAFO |
 |
| 10 |
Installation of replacement buoys and subsea hoses on the Tanker Mooring Facility subcontracted to Sharikat
Hani |
2002
-
2003 |
RAFO |
 |
| 11 |
Repairs to quay wall of Jebel Ali |
2003 |
Dubai Port
Authorities |
 |
| 12 |
Construction of temporary jetty for Oman Fertilizer Plant in Sur |
2003 |
CCC |
 |
| 13 |
Inspection program and installation of navigation buoys at Mina Raysut |
2003 |
Salalah Port Services |
 |
| 14 |
Construction of three concrete hard stands for aircraft and auxiliary equipment |
2003 |
RAFO |
 |
| 15 |
Complete inspection and maintenance of intake lines at Barka Power and Desalination Plant |
2003
-
2004 |
Hitachi
Zosen |
 |
| 16 |
Corniche development project in Abu Dhabi |
2003
-
2004 |
BM Engineering |
 |
| 17 |
Maintenance and inspection of intake system |
2003
-
2004 |
Oman Refinery
Company |
 |
| 18 |
Construction of seawater intake and outfall facilities for QLNG |
2004 |
Interbeton BV |
 |
| 19 |
Dredging of Dibba Harbour for Ministry of Agriculture and Fisheries, Oman |
2004 |
Sharikat Hani |
|
| 20 |
Supply of divers and construction plant for the Khasab-port project |
2004 |
Galfar |
 |
| 21 |
Installation of protection boom system at Al Ghubra Power Plant for Ministry of Electricity and Water Oman |
2004 |
PAEW |
 |
| 22 |
Internal inspection of pipelines |
2004 |
AES Barka |
 |
| 23 |
Removal of subsea bitumen line for Sharikat Hani |
2004 |
Shell Marketing Oman |
 |
| 24 |
Beach formation project in Al Khan, 200,000 m3 of sand placed to form recreational beach for Sharjah Municipality |
2004
-
2005 |
Darwish Engineering |
 |
| 25 |
Beach formation project in Al Khan, 200,000 m3 of sand placed to form recreational beach for Sharjah Municipality |
2004
-
2005 |
Darwish Engineering |
 |
| 26 |
Repair of OLNG outfall Pipeline in Sur |
2004
-
2005 |
Interbeton BV |
 |
| 27 |
Dredging contract Quriyat Fisheries Harbour |
2005 |
Ministry of Agriculture
& Fisheries |
 |
| 28 |
Hydrographic survey in Raysut and Al Ashkarah |
2005 |
Ministry of Agriculture
& Fisheries |
 |
| 29 |
Call Off emergency diving works at OMIFCO Sur |
2005 |
OMIFCO |
 |
| 30 |
Supply of marine spread including four barges, cranes and tugs in Sharjah, UAE |
2005 |
China Harbour Corporation |
 |
| 31 |
Extensive dredging programme within the bay in front of the Royal Court |
2005
-
2006 |
Qasr Alam Dredging Project |
|
| 32 |
Full internal cleaning of 4 x intake lines 2m diameter x 1200 m |
2005
-
2006 |
AES Barka |
|
| 33 |
Full diving services provided covering the construction of quay wall and breakwater for DIWAN Oman |
2005
-
2006 |
Interbeton BV |
 |
| 34 |
Construction of Groyne at Al Khan Lagoon in Sharjah |
2006 |
Darwish Engineering |
 |
| 35 |
RAK Supply of marine spread including tugs and bar |
2006 |
China Harbour Corporation |
 |
| 36 |
Full maintenance of seawater intake system of Al Ghubra Power and Desalination Plant |
Ongoing |
Sogex |
 |
| 37 |
Regular inspection and maintenance of vessels |
Ongoing |
Port Services Corporation |
 |
| 38 |
Complete refurbishment of tanker berthing and bunkering facility on Masirah Island |
|
Ministry of Defence Engineering Services |
 |
| 39 |
Overhaul of pontoon system at Bukha |
|
Ministry of Agriculture
& Fisheries |
 |
| 40 |
Installation of Outfall Lines at Ras Abu Fontas |
Jul 06
-ongoing |
Ital Impianti
(Qatar) |
 |
| 41 |
Sohar port phase III block setting project in 23m deep seawater |
2008 |
Six Construct Interbeton BV |
 |
| 42 |
Reef ball placing, Bar Al Jissah Resort |
|
Turner International |
 |
| 43 |
Moving Reef Balls at Banda Jissah |
2008 |
Ministry of
the Environment |
 |
| 44 |
Salvage of ‘Al Mudhaffar’ sunken 65’ leisure yacht off Marina Banda Al Rowda |
2008 |
Saud Bahwan |
 |
| 45 |
Salvage of 20m pontoon in Hyooth in Khasab and subsequent re-attachment following repairs |
June
-
Oct 08 |
Galfar |
 |
| 46 |
Installation of Intake Line 1.00 m Dia in Sur |
2008 |
Interbeton BV |
 |
| 47 |
Installation of Quay Wall October in Muttrah |
2008 |
Sarooj Construction |
 |
| 48 |
Diesel clearing from 2.1 Km subsea pipes in Masirah island |
2008 |
RAFO |
 |
| 49 |
Construction and Installation of 2.2 Km intake pipeline in Barka |
|
Doosan Heavy Industries & Construction |
 |
| 50 |
Construction and Installation of 1500m Quay Wall in Sharjah |
|
Six Construct |
 |
| 51 |
Supply of 7 divers for diving operations in Djibouti |
|
Odebrecht |
 |
| 52 |
Fast ferry Terminals at Khasab and Shinas |
|
Sarooj Construction |
 |
| 53 |
Dredging of for Asian Beach Games (300,000m3) |
|
Carillion Alawi |
 |
| 54 |
Dredging in Shinas Fast Ferry Terminal Construction (280,000m3) |
|
Sarooj Construction |
 |
| 55 |
Block Placing Works Wudam Naval Base 700 m |
|
Galfar |
 |
| 56 |
2 Km Quay Wall Construction at The Wave Muscat |
|
SNE |
|
| 57 |
Construction and Installation of 450 m Water Intake Pipeline Installation at The Wave Muscat |
|
SNE |
|
| 58 |
Subsea Investigation works in Musandam Gas Plant Project including Bathymetric Survey, Side Scan Survey and Sub Bottom Profiling Survey |
Ongoing |
HYUNDAI Engineering Company |
 |
| 59 |
Design and Installation of 300m Seawater Intake Pipeline for New Masirah Hospital, Masirah |
Ongoing |
Al Khalili Construction |
 |