Since establishment, Masirah International has successfully completed many projects. The list below shows some of our big projects with dates, demonstrating the versatility, experience and skills of the company. Please note that we are also very happy to carry out small scale operations and often do several of these a month in conjunction with the larger projects. We have equipment ready for any emergency and can mobilise a response team within a very short period.

 
No. PROJECT YEAR CLIENT
1. Refurbishment of infrastructure on berths in Port Rashid, Dubai. Work included redressing of revetment behind a sheet pile wall and placing of rocks 2001 Al Futaim
Tarmac
2 Construction of small fish processing unit on Masirah Island 2001 Sarwath
Fisheries
 
3 Qasr-Al-Alam quay wall construction. Work included seabed preparation, placing of pre-cast concrete blocks and armour rock for scour protection 2002 Tarmac Alawi
4 Installation of fender and bollard system at Mina Mussafah 2002 Arab Contractors
5 Construction of pre cast block quay wall at Saham Fishery Harbour 2002 CCC
6 Construction of kennel facility at Masirah Island 2002    
7 Fabrication and supply of eleven refrigeration units for Masirah      
8 Diving services for harbour construction at Al Ashkarah 2002
-
2003
Tarmac Alawi
9 Maintenance and overhaul of 40 accommodation suites contracted by US Navy in Masirah Island 2002
-
2003
RAFO
10 Installation of replacement buoys and subsea hoses on the Tanker Mooring Facility subcontracted to Sharikat
Hani
2002
-
2003
RAFO
11 Repairs to quay wall of Jebel Ali 2003 Dubai Port
Authorities
12 Construction of temporary jetty for Oman Fertilizer Plant in Sur 2003 CCC
13 Inspection program and installation of navigation buoys at Mina Raysut 2003 Salalah Port Services
14 Construction of three concrete hard stands for aircraft and auxiliary equipment 2003 RAFO
15 Complete inspection and maintenance of intake lines at Barka Power and Desalination Plant 2003
-
2004
Hitachi
Zosen
16 Corniche development project in Abu Dhabi 2003
-
2004
BM Engineering
17 Maintenance and inspection of intake system 2003
-
2004
Oman Refinery
Company
18 Construction of seawater intake and outfall facilities for QLNG 2004 Interbeton BV
19 Dredging of Dibba Harbour for Ministry of Agriculture and Fisheries, Oman 2004 Sharikat Hani  
20 Supply of divers and construction plant for the Khasab-port project 2004 Galfar
21 Installation of protection boom system at Al Ghubra Power Plant for Ministry of Electricity and Water Oman 2004 PAEW
22 Internal inspection of pipelines 2004 AES Barka
23 Removal of subsea bitumen line for Sharikat Hani 2004 Shell Marketing Oman
24 Beach formation project in Al Khan, 200,000 m3 of sand placed to form recreational beach for Sharjah Municipality 2004
-
2005
Darwish Engineering
25 Beach formation project in Al Khan, 200,000 m3 of sand placed to form recreational beach for Sharjah Municipality 2004
-
2005
Darwish Engineering
26 Repair of OLNG outfall Pipeline in Sur 2004
-
2005
Interbeton BV
27 Dredging contract Quriyat Fisheries Harbour 2005 Ministry of Agriculture
& Fisheries
28 Hydrographic survey in Raysut and Al Ashkarah 2005 Ministry of Agriculture
& Fisheries
29 Call Off emergency diving works at OMIFCO Sur 2005 OMIFCO
30 Supply of marine spread including four barges, cranes and tugs in Sharjah, UAE 2005 China Harbour Corporation
31 Extensive dredging programme within the bay in front of the Royal Court 2005
-
2006
Qasr Alam Dredging Project  
32 Full internal cleaning of 4 x intake lines 2m diameter x 1200 m 2005
-
2006
AES Barka  
33 Full diving services provided covering the construction of quay wall and breakwater for DIWAN Oman 2005
-
2006
Interbeton BV
34 Construction of Groyne at Al Khan Lagoon in Sharjah 2006 Darwish Engineering
35 RAK Supply of marine spread including tugs and bar 2006 China Harbour Corporation
36 Full maintenance of seawater intake system of Al Ghubra Power and Desalination Plant Ongoing Sogex
37 Regular inspection and maintenance of vessels Ongoing Port Services Corporation
38 Complete refurbishment of tanker berthing and bunkering facility on Masirah Island   Ministry of Defence Engineering Services
39 Overhaul of pontoon system at Bukha   Ministry of Agriculture
& Fisheries
40 Installation of Outfall Lines at Ras Abu Fontas Jul 06
-ongoing
Ital Impianti
(Qatar)
41 Sohar port phase III block setting project in 23m deep seawater 2008 Six Construct Interbeton BV
42 Reef ball placing, Bar Al Jissah Resort   Turner International
43 Moving Reef Balls at Banda Jissah 2008 Ministry of
the Environment
44 Salvage of ‘Al Mudhaffar’ sunken 65’ leisure yacht off Marina Banda Al Rowda 2008 Saud Bahwan
45 Salvage of 20m pontoon in Hyooth in Khasab and subsequent re-attachment following repairs June
-
Oct 08
Galfar
46 Installation of Intake Line 1.00 m Dia in Sur 2008 Interbeton BV
47 Installation of Quay Wall October in Muttrah 2008 Sarooj Construction
48 Diesel clearing from 2.1 Km subsea pipes in Masirah island 2008 RAFO
49 Construction and Installation of 2.2 Km intake pipeline in Barka   Doosan Heavy Industries & Construction
50 Construction and Installation of 1500m Quay Wall in Sharjah   Six Construct
51 Supply of 7 divers for diving operations in Djibouti   Odebrecht
52 Fast ferry Terminals at Khasab and Shinas   Sarooj Construction
53 Dredging of for Asian Beach Games (300,000m3)   Carillion Alawi
54 Dredging in Shinas Fast Ferry Terminal Construction (280,000m3)   Sarooj Construction
55 Block Placing Works Wudam Naval Base 700 m   Galfar
56 2 Km Quay Wall Construction at The Wave Muscat   SNE  
57 Construction and Installation of 450 m Water Intake Pipeline Installation at The Wave Muscat   SNE  
58 Subsea Investigation works in Musandam Gas Plant Project including Bathymetric Survey, Side Scan Survey and Sub Bottom Profiling Survey Ongoing HYUNDAI Engineering Company
59 Design and Installation of 300m Seawater Intake Pipeline for New Masirah Hospital, Masirah Ongoing Al Khalili Construction
 
In addition of the above some of our major projects at the moment are :
 
1 Construction and Installation of 563 m Seawater Intake Twin Pipeline (Ф 1.6 m) in Salalah IWPP Ongoing Sarooj Construction
SEPCO-III
2 Construction and Installation of 310m Outfall Pipeline (Ф 1.8 m) for Salalah IWPP Ongoing Sarooj Construction
SEPCO-III
3 Design and installation of Al Khuwaima Desalination Plant 550m Seawater Intake Twin Pipeline (Ф 200 mm) and 330m Brine Rejected Pipeline (Ф 200 mm) Ongoing ONEIC
4 Design and Installation of Brine Reject Pipeline in Extension of Lima Desalination, Lima Musandam Ongoing Nafal Contracting Company
5 Five year SPM Maintenance at Masirah Island Ongoing DESC
 